What is the process of parking lot striping? There are a few steps involved in parking lot striping. If you don’t know the best steps to follow, you’ll be left with an inferior parking lot. This can easily get out of control if you’re not careful, but it’s still something that can be managed with the right guidance. Here’s how to stripe a parking lot.
1. Preparation
As you’ll discover, the key to a good parking lot striping job is all in the preparation. You need to ensure that you have all the right materials and equipment before you even start thinking about applying paint to the pavement. First, you need a power washer to ensure that all the dirt and grime are removed from the pavement’s surface before you start painting. If there’s any debris on the pavement, it will prevent the paint from adhering properly.
2. Plan Your Lot
You need to take the time to plan out your parking lot before you start painting. Decide on the number of stalls, the width of the stalls, and the orientation of the stalls. Once you have all of this information, you can start painting. Making sure your lot is professionally planned will ensure that it looks great and functions properly.
3. Choose the Right Paint
For your parking lot to look its best, you need to use the right paint. Various types of paint can be used for parking lots, but not all are created equal. You must make sure that you choose paint specifically designed for parking lots. This type of paint is typically a latex-based paint with high solids content. This will ensure that the paint adheres properly to the pavement and lasts for a long time.
4. Apply the Paint
After you have prepared your pavement and chosen the right paint, you’re finally ready to start painting. You need to make sure that you use a painting machine that is specifically designed for parking lots. This machine will ensure that the paint is applied evenly and smoothly. Once the paint has been applied, let it dry completely before you allow any vehicles to park in the lot.
5. Allow Your Paint to Dry
You need to give your paint plenty of time to dry before you allow any vehicles to park in the lot. Depending on the type of paint that you use, this could take anywhere from 24 to 48 hours. Once the paint has dried, you can go ahead and start using your parking lot. Wash off any vehicles that get paint on them, and you’re all set.
Conclusion
Your lot should now be properly striped and looking great. If you follow these steps, you should have no problem getting a professional-looking parking lot. Just make sure that you take your time and do the job right. Contact Sunstar Seal Coating, Inc. for all your parking lot needs.